Documents on MVEIRB Public Registry for Deh Cho Bridge project 

Date: 2005-04-05
Stage: Post REA Materials and Consult to Modify  

 

  1. INDIAN AND NORTHERN AFFAIRS Acceptance Letter Dehcho Bridge March 15 2005
    Date: 2005-03-15
    Stage: Minister's Decision and Final Measure
    Description: A letter from Indian and Northern Affairs Minister Andy Scott to MVEIRB, accepting Dehcho Bridge decision, and adopting it.
  2. Report of Environmental Assessment and Reasons for Decision on the Dehcho Bridge Corporation's proposed Mackenzie River Bridge
    Date: 2004-12-10
    Stage: Report of Environmental Assessment
    Description: MVEIRB's Report for the proposed Mackenzie River Bridge project at Fort Providence, NWT
  3. INAC letter to MVEIRB stating no significant land claim issues with DCBC bridge location.
    Date: 2004-11-08
    Stage: Additional Information
  4. Dehcho Bridge Corporation Hearing Presentation (October 12-04)
    Date: 2004-10-24
    Stage: Public Hearings
    Description: Dehcho Bridge Corporation's submission for the October 21 Public Hearing in Fort Providence, NT.
  5. GNWT Public Hearing Presentation
    Date: 2004-10-21
    Stage: Public Hearings
    Description: The GNWT Public Hearing submission - Fort Providence, NT.
  6. FINAL Public Hearing Agenda
    Date: 2004-10-21
    Stage: Public Hearings
    Description: FINAL Public Hearing agenda in Fort Providence, NT.
  7. Letter from Indian and Northern Affairs Canada to MVEIRB re: Pre-Hearing Conference Meeting for the Dehcho Bridge Environmental Assessment
    Date: 2004-10-19
    Stage: Pre-Hearing Conference
    Description: Comments regarding the Pre Hearing Conference for the Mackenzie River Bridge project at Fort Providence, NWT
  8. Letter from Jivko Engineering to Fisheries and Oceans Canada re: Additional Information to Amend the Application for FISHERIES AND OCEANS Authorization
    Date: 2004-10-16
    Stage: Public Hearings
    Description: Dehcho Bridge Corporation detailing changes to the proposed Mackenzie River Bridge project at Fort Providence, NWT resulting from meetings between the Corporation and Fisheries and Oceans Canada
  9. DFO public hearing presentation summary and speakers notes
    Date: 2004-10-15
    Stage: Public Hearings
  10. FISHERIES AND OCEANS Hearing Presentation (October 14-04)
    Date: 2004-10-14
    Stage: Pre-Hearing Conference
    Description: Fisheries and Oceans' hearing presentation for the upcoming public hearing in Fort Providence, NT on October 21, 2004.
  11. INDIAN AND NORTHERN AFFAIRS Hearing Presentation (October 14-04)
    Date: 2004-10-14
    Stage: Pre-Hearing Conference
    Description: Indian and Northern Affairs' hearing presentation for the upcoming public hearing in Fort Providence, NT on October 21, 2004.
  12. DFO public hearing presentation.
    Date: 2004-10-14
    Stage: Public Hearings
  13. Environment Canada Hearing Presentation (October 12-04)
    Date: 2004-10-12
    Stage: Public Hearings
    Description: Environment Canada's submission for the October 21 Public Hearing in Fort Providence, NT.
  14. DEHCHO BRIDGE CORPORATION RE Species at Risk (October 12, 2004)
    Date: 2004-10-12
    Stage: Pre-Hearing Conference
    Description: DEHCHO BRIDGE CORPORATION correspondence with Environment Canada regarding Species at Risk commitments.
  15. Additional information from DCBC to DFO addressing concerns and requests
    Date: 2004-10-12
    Stage: Scoping
    Description: Additional info provided is also to amend the application for DFO authorization.
  16. MVEIRB Report re: Mackenzie River Bridge Peer Review Report (October 8 -04)
    Date: 2004-10-08
    Stage: Pre-Hearing Conference
    Description: The Review Board's comments and review of the Peer Report, as outlined at the Pre Hearing Conference of October 4, 2004.
  17. Dehcho Bridge Corporation Pre Hearing Response (Oct 4-04)
    Date: 2004-10-04
    Stage: Pre-Hearing Conference
    Description: The Dehcho Bridge Corporation response to parties' Pre Hearing Conference worksheets and Technical Reports (October 4-04).
  18. Pre Hearing Conference notes
    Date: 2004-10-04
    Stage: Pre-Hearing Conference
  19. Pre Hearing Conference Attendance (October 4-04)
    Date: 2004-10-04
    Stage: Pre-Hearing Conference
    Description: Attendance list for the Dehcho Bridge Pre Hearing Conference held October 4, 2004.
  20. Indian and Northern Affairs Pre Hearing Conference Worksheets
    Date: 2004-10-01
    Stage: Pre-Hearing Conference
    Description: Indian and Northern Affairs' Pre Hearing Conference worksheets (October 1, 2004)
  21. INDIAN AND NORTHERN AFFAIRS Pre Hearing Conference Worksheets
    Date: 2004-10-01
    Stage: Pre-Hearing Conference
    Description: Indian and Northern Affairs' completed Pre Hearing Conference worksheets in anticipation of the October 4 PRE-HEARING CONFERENCE.
  22. FISHERIES AND OCEANS Pre Hearing Conference Worksheets
    Date: 2004-10-01
    Stage: Pre-Hearing Conference
    Description: Fisheries and Oceans' completed Pre Hearing Conference worksheets in anticipation of the October 4 meeting.
  23. DRAFT Public Hearing Agenda (October 1-04)
    Date: 2004-10-01
    Stage: Pre-Hearing Conference
    Description: DRAFT Public Hearing agenda for discussion at the October 4, 2004 Pre Hearing Conference.
  24. Information Request - Peer Review Report (September 30, 2004)
    Date: 2004-09-30
    Stage: Information Requests
    Description: Further response to Information Request 2.1.1 regarding the status of the Peer Review Report (September 30, 2004)
  25. GNWT Pre Hearing Conference Worksheets (Sept 24-04)
    Date: 2004-09-24
    Stage: Pre-Hearing Conference
    Description: GNWT Pre Hearing Conference materials submitted to the Review Board in anticipation of the October 4, 2004 PRE-HEARING CONFERENCE.
  26. Environment Canada Pre Hearing Conference Worksheets (Sept 24-04)
    Date: 2004-09-24
    Stage: Pre-Hearing Conference
    Description: Environment Canada's material submitted to the Board prior to the October 4, 2004 Pre Hearing conference.
  27. Email from DCBC to MVEIRB re: technical reports and peer review clarifications
    Date: 2004-09-24
    Stage: Technical Reports
  28. DAR Appendix 12 (REVISED September 21, 2004)
    Date: 2004-09-21
    Stage: Developers Assessment Report
    Description: Developer's Assessment Report Appendix 12 - Cost Benefit Analysis (REVISED September 2004)
  29. Appendix 12 - Developers Assessment Report (Revised Sept 21-04)
    Date: 2004-09-21
    Stage: Developers Assessment Report
    Description: Nichols Cost-Benefit Report, submitted as Appendix 12 for the DAR (Revised September 21, 2004).
  30. Northern News Services media article on DCBC decisions
    Date: 2004-09-17
    Stage: Additional Information
  31. Indian and Northern Affairs Canada Technical Report (Sept 10-04)
    Date: 2004-09-13
    Stage: Technical Reports
    Description: Indian and Northern Affairs Canada's Technical Report on the Dehcho Bridge Corporation's proposed Mackenzie River Bridge.
  32. Pre Hearing Conference Material (EA03-008)
    Date: 2004-09-13
    Stage: Pre-Hearing Conference
    Description: Pre Hearing Conference guidelines and worksheets for the preparation of parties prior to the public hearing (October 21, 2004).
  33. Environment Canada Technical Report (Sept 10-04)
    Date: 2004-09-10
    Stage: Technical Reports
    Description: Environment Canada's Technical Report on the Dehcho Bridge Corporation's proposed Mackenzie River Bridge.
  34. Outstanding Information Requests Response on Cumulative Effects
    Date: 2004-09-07
    Stage: Information Requests
    Description: Final Response to Information Request 2.1.21 issued to the Dehcho Bridge Corporation
  35. Email from DCBC to MVEIRB re: technical reports questions and clarification
    Date: 2004-09-07
    Stage: Technical Reports 
  36. DCBC response to Information Request 2.1.21
    Date: 2004-09-07
    Stage: Information Requests
  37. MVEIRB note to file re: DCBC indication of late final IR response submission date.
    Date: 2004-09-03
    Stage: Information Requests
  38. GNWT IR responses and Dillon Consulting report.
    Date: 2004-08-31
    Stage: Information Requests
    Description: Dillon Consulting Ltd. report title: Phase I and II Environmental Site Assessment for Providence Ferry Landings, Ft. Providence, NWT.
  39. Proposed Information Requests from the Dehcho Bridge Corporation, second round
    Date: 2004-08-24
    Stage: Information Requests
    Description: Deh Cho Bridge Co. responses to 2nd round of IRs sections 2.1.1 to 2.1.20.
  40. MVEIRB notification of report and conference dates to distribution list.
    Date: 2004-08-24
    Stage: EA Start Up
  41. MVEIRB to A.Gamble re: response to IR round 2 questions.
    Date: 2004-07-26
    Stage: Information Requests
  42. Revised EC - IRs
    Date: 2004-07-26
    Stage: Information Requests
    Description: Clarifications.
  43. Information Requests issued by the MVEIRB (Round 2)
    Date: 2004-07-26
    Stage: Information Requests
    Description: Information Requests related to the Mackenzie River Bridge project at Fort Providence, NWT
  44. Email from A.Gamble to MVEIRB re: IR round 2 response questions
    Date: 2004-07-26
    Stage: Information Requests
  45. Environment Canada - IRs
    Date: 2004-07-16
    Stage: Information Requests
  46. INAC - IRs
    Date: 2004-07-16
    Stage: Information Requests

Dehcho Bridge - Response to Information Requests 1.1.4

Date: 2004-07-06 Stage: Information Requests

Description: Dehcho Bridge Corporation's response to first round of information requests

 

 

  1. Dehcho Bridge Corporation's revised response to information requests
    Date: 2004-07-10
    Stage: Information Requests
    Description: Revised responses to information request 1.1.4, Mackenzie River Bridge at Fort Providence, NWT
  2. Dehcho Bridge Corporation's response to information requests
    Date: 2004-07-07
    Stage: Information Requests
    Description: Dehcho Bridge Corporations responses to the first round of information requests issued by the MVEIRB regarding the Mackenzie River Bridge at Fort Providence, NWT
  3. Information Requests issued by the MVEIRB (Round 1)
    Date: 2004-06-30
    Stage: Information Requests
    Description: Information Requests related to the Mackenzie River Bridge project at Fort Providence, NWT
  4. Letter from the MVEIRB re: Party Status for the Dehcho Mackenzie River Bridge
    Date: 2004-06-22
    Stage: EA Start Up
    Description: Letter states participants who have been granted party status to the environmental assessment of the Mackenzie River Bridge project at Fort Providence, NWT
  5. Identification Form for EA role - EC advice
    Date: 2004-06-11
    Stage: EA Start Up
  6. Identification Form for EA role - INAC
    Date: 2004-06-11
    Stage: EA Start Up
  7. Identification Form for EA role - NWT Metis Nation
    Date: 2004-06-11
    Stage: EA Start Up
  8. Identification Form for EA role - GNWT
    Date: 2004-06-09
    Stage: EA Start Up
  9. Notes on Site Visit at the Mackenzie River, Fort Providence, NWT
    Date: 2004-06-08
    Stage: Additional Information
    Description: Notes on the MVEIRB's visit to Fort Providence to review the site of the proposed Mackenzie River Bridge.
  10. Identification Form for EA role - expert advice provided by DFO
    Date: 2004-06-08
    Stage: EA Start Up
  11. MVEIRB request for site visit to Deh Cho Bridge Co.
    Date: 2004-06-02
    Stage: Additional Information
  12. Letter from the MVEIRB to the Dehcho Bridge Corporation re: conformity with the Terms of Reference
    Date: 2004-05-28
    Stage: Developers Assessment Report
    Description: Letter confirms that the revised Developer's Assessment Report conforms with the terms of reference for the environmental assessment of the Mackenzie River Bridge project at Fort Providence, NWT
  13. DAR Addendum 1
    Date: 2004-05-28
    Stage: Developers Assessment Report
  14. CBC news article on MLA questions on financial risks of bridge.
    Date: 2004-05-27
    Stage: Additional Information
  15. Letter from Jivko Engineering re: River navigation and the proposed Mackenzie River Bridge
    Date: 2004-05-26
    Stage: Additional Information
    Description: Letter asks for comments on the proposed project at Fort Providence and it's conformity to the Navigable Waters Protection Act requirements.
  16. Appendix 1 - Updated Project Description rev may 25-04
    Date: 2004-05-25
    Stage: Developers Assessment Report
    Description: Developer's Assessment Report for the Mackenzie River Bridge project at Fort Providence NWT
  17. Revised Developer's Assessment Report from the Dehcho Bridge Corporation
    Date: 2004-05-24
    Stage: Developers Assessment Report
    Description: Revised version of the Developer's Assessment Report for the Mackenzie River Bridge project at Fort Providence, NWT
  18. Conformity Table for the Developer's Assessment Report
    Date: 2004-04-21
    Stage: Developers Assessment Report
    Description: Table outlines which section conform or do not conform to the terms of reference set out for the environmental assessment of the Mackenzie River Bridge project at Fort Providence, NWT
  19. Letter from MVEIRB to the Dehcho Bridge Corporation re: Conformity of the developer's assessment report
    Date: 2004-04-21
    Stage: Developers Assessment Report
    Description: Letter informs Dehcho Bridge Corporation that the submitted developer's assessment report does not conform to the terms of reference of the environmental assessment of the Mackenzie River Bridge Project at Fort Providence, NWT
  20. Letter from Jivko Engineering to Canadian Coast Guard re: Consultations related to the project
    Date: 2004-04-20
    Stage: Additional Information
    Description: Letter on information related to additional consultations for the Mackenzie River Bridge project at Fort Providence, NWT
  21. Appendix 1 - Updated Project Description
    Date: 2004-04-01
    Stage: Developers Assessment Report
    Description: Developer's Assessment Report for the Mackenzie River Bridge project at Fort Providence NWT
  22. Jivko Engineering letter to parties for comments and concerns on proposed bridge structure.
    Date: 2004-03-26
    Stage: Scoping
  23. Dehcho Bridge Corporation's Brief Project Description
    Date: 2004-03-22
    Stage: Developers Assessment Report
    Description: Summarized version of the developer's assessment report for the Mackenzie River Bridge project at Fort Providence, NWT
  24. MVEIRB guideline to developer to submit a DAR
    Date: 2004-03-17
    Stage: Terms of Reference
  25. Final Terms of Reference
    Date: 2004-03-05
    Stage: Terms of Reference
  26. Comments on the Draft Terms of Reference by GNWT
    Date: 2004-02-26
    Stage: Terms of Reference
    Description: Comments to the MVEIRB on the Draft Terms of Reference by GNWT - Resources, Wildlife and Economic Development on the Mackenzie River Bridge project at Fort Providence, NWT
  27. Comments on the Draft Terms of Reference by Environment Canada
    Date: 2004-02-25
    Stage: Terms of Reference
    Description: Comments to the MVEIRB on the Draft Terms of Reference by Environment Canada on the Mackenzie River Bridge project at Fort Providence, NWT
  28. Comments on the Draft Terms of Reference by Indian and Northern Affairs
    Date: 2004-02-25
    Stage: Terms of Reference
    Description:
    Comments to the MVEIRB on the Draft Terms of Reference by Indian and Northern Affairs on the Mackenzie River Bridge project at Fort Providence, NWT
  29. Letter from Jivko Engineering to MVEIRB of provision of additional information related to application for water licence.
    Date: 2004-02-20
    Stage: Preliminary Screening
    Description: Info was sent in both hardcopy and digital CD formats, files are too large to upload and are located at the MVEIRB public registry office.
  30. DFO letter to MVEIRB of notification of withdrawal of concern from NWT Chamber of Mines and discharging of responsibilities as preliminary screener.
    Date: 2004-02-16
    Stage: Preliminary Screening
  31. Application for Water Licence and additional information requested by DIAND
    Date: 2004-02-12
    Stage: Preliminary Screening
  32. MVEIRB letter to DIAND re: clarification of questions raised in January 11, 2005 meeting.
    Date: 2004-02-11
    Stage: Additional Information
    Description: Letter response to several questions raised by DIAND inquiring about mitigation commmitments by the developer.
  33. Comments on the Draft Terms of Reference by Jivko Engineering
    Date: 2004-02-09
    Stage: Terms of Reference
    Description: Comments to the MVEIRB on the Draft Terms of Reference by Jivko Engineering on the Mackenzie River Bridge project at Fort Providence, NWT
  34. Comments on the Draft Terms of Reference by developer
    Date: 2004-02-09
    Stage: Terms of Reference
    Description: Comments to the MVEIRB on the Draft Terms of Reference by the Dehcho Bridge Corporation on the Mackenzie River Bridge project at Fort Providence, NWT
  35. Letter from the NWT Chamber of Mines to Fisheries and Oceans Canada and MVEIRB re: letter of concern
    Date: 2004-02-04
    Stage: EA Start Up
    Description: Chamber of Mines withdraws it's letter of concern regarding the environmental assessment of the Mackenzie River Bridge project
  36. Letter from Jivko Engineering to MVEIRB re: Additional information for project water license application
    Date: 2004-02-04
    Stage: Developers Assessment Report
    Description: Cover letter for additional information provided for Mackenzie River Bridge project at Fort Providence, NWT
  37. Draft Terms of Reference an Workplan
    Date: 2004-02-04
    Stage: Terms of Reference
  38. Dillon Consulting Final Report (Feb 2004)
    Date: 2004-02-01
    Stage: Technical Reports
    Description: GNWT Phase I and II Environmental Site Assessment of the Fort Providence Ferry Landings - Final Report (February 2004)
  39. Dillon Consulting Final Report (Feb 2004) - Appendix A
    Date: 2004-02-01
    Stage: Technical Reports
    Description: Appendix A - FINAL REPORT (February 2004)
  40. Dillon Consulting Final Report (Feb 2004) - Appendix B
    Date: 2004-02-01
    Stage: Technical Reports
    Description: Appendix B - Final REPORT (February 2004)
  41. Dillon Consulting Final Report (Feb 2004) - Appendix C
    Date: 2004-02-01
    Stage: Technical Reports
    Description: Appendix C - FINAL Report GNWT (February 2004)
  42. Dillon Consulting Final Report (Feb 2004) - Appendix E
    Date: 2004-02-01
    Stage: Technical Reports
    Description: Appendix E FINAL Report GNWT (February 2004)
  43. Dillon Consulting Final Report (Feb 2004) - Appendix F
    Date: 2004-02-01
    Stage: Technical Reports
    Description: Appendix F FINAL Report GNWT (February 2004)
  44. Dillon Consulting Final Report (Feb 2004) - Appendix G
    Date: 2004-02-01
    Stage: Technical Reports
    Description: Appendix G - FINAL Report GNWT (February 2004)
  45. Appendix D - Dillon Report
    Date: 2004-02-01
    Stage: Technical Reports
    Description: Appendix D of the Dillon Consulting GNWT commissioned FINAL REPORT.
  46. Dillon Consulting Final Report (Feb 2004) - Appendix D
    Date: 2004-02-01
    Stage: Technical Reports
    Description: Appendix D - Final REPORT GNWT (February 2004)
  47. Letter from the Dehcho Bridge Corporation to the MVEIRB, the Mackenzie Valley Land & Water Board and Fisheries and Oceans Canada re: EA of the Mackenzie River Bridge
    Date: 2004-01-27
    Stage: EA Start Up
    Description: Letter concerning the status of the environmental assessment of the Mackenzie River Bridge at Fort Providence, NWT
  48. Letter from the Dehcho Bridge Corporation to the NWT Chamber of Mines re: Mackenzie River Bridge project
    Date: 2004-01-26
    Stage: EA Start Up
    Description: Letters from Andrew Gamble to the Chamber of Mines
  49. Chamber of Mines-Withdraw letter of concern
    Date: 2004-01-26
    Stage: EA Start Up
    Description: The NWT Chamber of Mines letter of Jan. 26/04 withdrawing its letter of concern. Duplicated file.
  50. Letter from the Dehcho Bridge Corporation to Fisheries and Oceans Canada re: EA of the Mackenzie River Bridge
    Date: 2004-01-14
    Stage: EA Start Up
    Description: Letter requests clarification on the status of the environmental assessment of the Mackenzie River Bridge project at Fort Providence, NWT
  51. Edmonton Sun news article
    Date: 2004-01-14
    Stage: Additional Information
  52. News media advertisement for referral to EA
    Date: 2004-01-10
    Stage: EA Start Up
  53. Northern News Services news article
    Date: 2004-01-09
    Stage: Additional Information
    Description: Re: Delayed bridge construction
  54. Preliminary Screening report and referral from the Department of Fisheries and Oceans
    Date: 2004-01-06
    Stage: Preliminary Screening
    Description: Preliminary Screening report and referral from the Department of Fisheries and Oceans
  55. Notice of Referral for the Dehcho Bridge Corporation
    Date: 2004-01-02
    Stage: EA Start Up
    Description: Announces the referral of the Dehcho Bridge Corporation's proposed Mackenzie River Bridge project to environmental assessment
  56. Project Description and Preliminary Design Drawings-updated Jan 2004
    Date: 2004-01-01
    Stage: Developers Assessment Report
    Description: Developer's Assessment Report for the Mackenzie River Bridge project at Fort Providence NWT
  57. Deh Cho Bridge Permitting Process
    Date: 2004-01-01
    Stage: Preliminary Screening
    Description: Records of applications, reports and correspondence. File is too large to upload, hard copy of 2 volume binders is located at the MVEIRB public registry office.
  58. Draft Workplan for the Mackenzie River Bridge project
    Date: 2003-12-18
    Stage: EA Start Up
    Description: Draft Workplan EA for the proposed Mackenzie River Bridge project at Fort Providence, NWT
  59. Globe and Mail News article
    Date: 2003-09-13
    Stage: Additional Information
  60. INAC news release
    Date: 2003-04-14
    Stage: Additional Information
    Description: Re: Additional funding support to Ft. Providence for Deh Cho Bridge Proposal
  61. Deh Cho Bridge Act
    Date: 2003-02-20
    Stage: Additional Information
    Description: Authorization from Minister and on behalf of the GNWT to enter into agreements with a concessionarire to construct, operate and maintain the Deh Cho Bridge.
  62. Letter from the Northern Transport Company Ltd to the Dehcho Bridge Corporation re: support for the Mackenzie River Bridge
    Date: 2003-01-09
    Stage: Additional Information
    Description: Letter confirms support for the Mackenzie River Bridge project at Fort Providence, NWT, with certain conditions
  63. Northern Transportation Co. letter to Deh Cho Bridge Co. confirmation of agreement for structure modifications.
    Date: 2003-01-09
    Stage: Scoping
  64. CBC News article on rising steel prices and bridge costs.
    Date: 2002-05-10
    Stage: Additional Information
  65. Dehcho Bridge Corporation Presentation
    Date: 0000-00-00
    Stage: Public Hearings
    Description: Developer's presentation at public hearing regarding Mackenzie River Bridge project at Fort Providence, NWT
  66. Appendix 10 - Dehcho Bridge Act
    Date: 0000-00-00
    Stage: Developers Assessment Report
    Description: Developer's Assessment Report for the Mackenzie River Bridge project at Fort Providence NWT
  67. Appendix 12 - Nichols Benefit-Cost Analysis
    Date: 0000-00-00
    Stage: Developers Assessment Report
    Description: Developer's Assessment Report for the Mackenzie River Bridge project at Fort Providence NWT
  68. Appendix 13 - Traffic Forecast
    Date: 0000-00-00
    Stage: Developers Assessment Report
    Description: Developer's Assessment Report for the Mackenzie River Bridge project at Fort Providence NWT
  69. Appendix 14 - Golder Report
    Date: 0000-00-00
    Stage: Developers Assessment Report
    Description: Developer's Assessment Report for the Mackenzie River Bridge project at Fort Providence NWT
  70. Appendix 15 - Trillium Hydrotechnical Report
    Date: 0000-00-00
    Stage: Developers Assessment Report
    Description: Developer's Assessment Report for the Mackenzie River Bridge project at Fort Providence NWT
  71. Appendix 16 - EBA Geotechnical report
    Date: 0000-00-00
    Stage: Developers Assessment Report
    Description: Developer's Assessment Report for the Mackenzie River Bridge project at Fort Providence NWT
  72. Appendix 1A - Plans & Drawings
    Date: 0000-00-00
    Stage: Developers Assessment Report
    Description: Developer's Assessment Report for the Mackenzie River Bridge project at Fort Providence NWT
  73. Appendix 1B - Schematic Spill Contingency Plan
    Date: 0000-00-00
    Stage: Developers Assessment Report
    Description: Developer's Assessment Report for the Mackenzie River Bridge project at Fort Providence NWT
  74. Appendix 3 - MACKENZIE VALLEY LAND AND WATER BOARD Water License Application
    Date: 0000-00-00
    Stage: Developers Assessment Report
    Description: Developer's Assessment Report for the Mackenzie River Bridge project at Fort Providence NWT
  75. Appendix 4 - Coast Guard NWPA Application
    Date: 0000-00-00
    Stage: Developers Assessment Report
    Description: Developer's Assessment Report for the Mackenzie River Bridge project at Fort Providence NWT
  76. Appendix 5 - Fisheries and Oceans Application
    Date: 0000-00-00
    Stage: Developers Assessment Report
    Description: Developer's Assessment Report for the Mackenzie River Bridge project at Fort Providence NWT
  77. Appendix 6 - MACKENZIE VALLEY LAND AND WATER BOARD Land Use Application
    Date: 0000-00-00
    Stage: Developers Assessment Report
    Description: Developer's Assessment Report for the Mackenzie River Bridge project at Fort Providence NWT
  78. Appendix 7 - Draft Community Benefits Commitment Plan
    Date: 0000-00-00
    Stage: Developers Assessment Report
    Description: Developer's Assessment Report for the Mackenzie River Bridge project at Fort Providence NWT
  79. Appendix 8 - Nadli Report on Benefits Plan
    Date: 0000-00-00
    Stage: Developers Assessment Report
    Description: Developer's Assessment Report for the Mackenzie River Bridge project at Fort Providence NWT
  80. Appendix 9 - Letters of Support
    Date: 0000-00-00
    Stage: Developers Assessment Report
    Description: Developer's Assessment Report for the Mackenzie River Bridge project at Fort Providence NWT
  81. Appendix 11 Memorandum of Intent
    Date: 0000-00-00
    Stage: Developers Assessment Report
    Description: Developer's Assessment Report for the Mackenzie River Bridge project at Fort Providence NWT
  82. Appendix 2 - Correspondence
    Date: 0000-00-00
    Stage: Developers Assessment Report
    Description: Developer's Assessment Report for the Mackenzie River Bridge project at Fort Providence NWT
  83. 3 Geotechnical Investigation Report-EBA Engineering Feb 2004
    Date: 0000-00-00
    Stage: Developers Assessment Report
    Description: Developer's Assessment Report for the Mackenzie River Bridge project at Fort Providence NWT
  84. 2 Fish Habitat Assessment Report-Golder Associates Jan29-04
    Date: 0000-00-00
    Stage: Developers Assessment Report
    Description: Developer's Assessment Report for the Mackenzie River Bridge project at Fort Providence NWT
  85. 4 Updated Hydrotechnical Info Rep-Trillium Eng Nov 2003 Part 1
    Date: 0000-00-00
    Stage: Developers Assessment Report
    Description: Developer's Assessment Report for the Mackenzie River Bridge project at Fort Providence NWT
  86. 4 Updated Hydrotechnical Info Rep-Trillium Eng Nov 2003 Part 2
    Date: 0000-00-00
    Stage: Developers Assessment Report
    Description: Developer's Assessment Report for the Mackenzie River Bridge project at Fort Providence NWT
  87. 4 Updated Hydrotechnical Info Rep-Trillium Eng Nov 2003 Part 3
    Date: 0000-00-00
    Stage: Developers Assessment Report
    Description: Developer's Assessment Report for the Mackenzie River Bridge project at Fort Providence NWT
  88. Revised Appendix D for the Dehcho Bridge DAR
    Date: 0000-00-00
    Stage: Developers Assessment Report
    Description: Revised Appendix D for the Dehcho Bridge Developer's Assessment Report.
  89. Dehcho Bridge - Developers Assessment Report
    Date: 0000-00-00
    Stage: Developers Assessment Report
  90. public hearing notice advertisement in the Deh Cho Drum paper
    Date: 0000-00-00
    Stage: Public Hearings
  91. Board decisions for reports and conference due dates for various EA phases.
    Date: 0000-00-00
    Stage: Additional Information
 