| Documents on MVEIRB Public Registry for Deh Cho Bridge project |
|
Date: 2005-04-05
Stage: Post REA Materials and Consult to Modify
- INDIAN AND NORTHERN AFFAIRS Acceptance Letter Dehcho Bridge March 15 2005
Date: 2005-03-15
Stage: Minister's Decision and Final Measure
Description: A letter from Indian and Northern Affairs Minister Andy Scott to MVEIRB, accepting Dehcho Bridge decision, and adopting it.
- Report of Environmental Assessment and Reasons for Decision on the Dehcho Bridge Corporation's proposed Mackenzie River Bridge
Date: 2004-12-10
Stage: Report of Environmental Assessment
Description: MVEIRB's Report for the proposed Mackenzie River Bridge project at Fort Providence, NWT
- INAC letter to MVEIRB stating no significant land claim issues with DCBC bridge location.
Date: 2004-11-08
Stage: Additional Information
- Dehcho Bridge Corporation Hearing Presentation (October 12-04)
Date: 2004-10-24
Stage: Public Hearings
Description: Dehcho Bridge Corporation's submission for the October 21 Public Hearing in Fort Providence, NT.
- GNWT Public Hearing Presentation
Date: 2004-10-21
Stage: Public Hearings
Description: The GNWT Public Hearing submission - Fort Providence, NT.
- FINAL Public Hearing Agenda
Date: 2004-10-21
Stage: Public Hearings
Description: FINAL Public Hearing agenda in Fort Providence, NT.
- Letter from Indian and Northern Affairs Canada to MVEIRB re: Pre-Hearing Conference Meeting for the Dehcho Bridge Environmental Assessment
Date: 2004-10-19
Stage: Pre-Hearing Conference
Description: Comments regarding the Pre Hearing Conference for the Mackenzie River Bridge project at Fort Providence, NWT
- Letter from Jivko Engineering to Fisheries and Oceans Canada re: Additional Information to Amend the Application for FISHERIES AND OCEANS Authorization
Date: 2004-10-16
Stage: Public Hearings
Description: Dehcho Bridge Corporation detailing changes to the proposed Mackenzie River Bridge project at Fort Providence, NWT resulting from meetings between the Corporation and Fisheries and Oceans Canada
- DFO public hearing presentation summary and speakers notes
Date: 2004-10-15
Stage: Public Hearings
- FISHERIES AND OCEANS Hearing Presentation (October 14-04)
Date: 2004-10-14
Stage: Pre-Hearing Conference
Description: Fisheries and Oceans' hearing presentation for the upcoming public hearing in Fort Providence, NT on October 21, 2004.
- INDIAN AND NORTHERN AFFAIRS Hearing Presentation (October 14-04)
Date: 2004-10-14
Stage: Pre-Hearing Conference
Description: Indian and Northern Affairs' hearing presentation for the upcoming public hearing in Fort Providence, NT on October 21, 2004.
- DFO public hearing presentation.
Date: 2004-10-14
Stage: Public Hearings
- Environment Canada Hearing Presentation (October 12-04)
Date: 2004-10-12
Stage: Public Hearings
Description: Environment Canada's submission for the October 21 Public Hearing in Fort Providence, NT.
- DEHCHO BRIDGE CORPORATION RE Species at Risk (October 12, 2004)
Date: 2004-10-12
Stage: Pre-Hearing Conference
Description: DEHCHO BRIDGE CORPORATION correspondence with Environment Canada regarding Species at Risk commitments.
- Additional information from DCBC to DFO addressing concerns and requests
Date: 2004-10-12
Stage: Scoping
Description: Additional info provided is also to amend the application for DFO authorization.
- MVEIRB Report re: Mackenzie River Bridge Peer Review Report (October 8 -04)
Date: 2004-10-08
Stage: Pre-Hearing Conference
Description: The Review Board's comments and review of the Peer Report, as outlined at the Pre Hearing Conference of October 4, 2004.
- Dehcho Bridge Corporation Pre Hearing Response (Oct 4-04)
Date: 2004-10-04
Stage: Pre-Hearing Conference
Description: The Dehcho Bridge Corporation response to parties' Pre Hearing Conference worksheets and Technical Reports (October 4-04).
- Pre Hearing Conference notes
Date: 2004-10-04
Stage: Pre-Hearing Conference
- Pre Hearing Conference Attendance (October 4-04)
Date: 2004-10-04
Stage: Pre-Hearing Conference
Description: Attendance list for the Dehcho Bridge Pre Hearing Conference held October 4, 2004.
- Indian and Northern Affairs Pre Hearing Conference Worksheets
Date: 2004-10-01
Stage: Pre-Hearing Conference
Description: Indian and Northern Affairs' Pre Hearing Conference worksheets (October 1, 2004)
- INDIAN AND NORTHERN AFFAIRS Pre Hearing Conference Worksheets
Date: 2004-10-01
Stage: Pre-Hearing Conference
Description: Indian and Northern Affairs' completed Pre Hearing Conference worksheets in anticipation of the October 4 PRE-HEARING CONFERENCE.
- FISHERIES AND OCEANS Pre Hearing Conference Worksheets
Date: 2004-10-01
Stage: Pre-Hearing Conference
Description: Fisheries and Oceans' completed Pre Hearing Conference worksheets in anticipation of the October 4 meeting.
- DRAFT Public Hearing Agenda (October 1-04)
Date: 2004-10-01
Stage: Pre-Hearing Conference
Description: DRAFT Public Hearing agenda for discussion at the October 4, 2004 Pre Hearing Conference.
- Information Request - Peer Review Report (September 30, 2004)
Date: 2004-09-30
Stage: Information Requests
Description: Further response to Information Request 2.1.1 regarding the status of the Peer Review Report (September 30, 2004)
- GNWT Pre Hearing Conference Worksheets (Sept 24-04)
Date: 2004-09-24
Stage: Pre-Hearing Conference
Description: GNWT Pre Hearing Conference materials submitted to the Review Board in anticipation of the October 4, 2004 PRE-HEARING CONFERENCE.
- Environment Canada Pre Hearing Conference Worksheets (Sept 24-04)
Date: 2004-09-24
Stage: Pre-Hearing Conference
Description: Environment Canada's material submitted to the Board prior to the October 4, 2004 Pre Hearing conference.
- Email from DCBC to MVEIRB re: technical reports and peer review clarifications
Date: 2004-09-24
Stage: Technical Reports
- DAR Appendix 12 (REVISED September 21, 2004)
Date: 2004-09-21
Stage: Developers Assessment Report
Description: Developer's Assessment Report Appendix 12 - Cost Benefit Analysis (REVISED September 2004)
- Appendix 12 - Developers Assessment Report (Revised Sept 21-04)
Date: 2004-09-21
Stage: Developers Assessment Report
Description: Nichols Cost-Benefit Report, submitted as Appendix 12 for the DAR (Revised September 21, 2004).
- Northern News Services media article on DCBC decisions
Date: 2004-09-17
Stage: Additional Information
- Indian and Northern Affairs Canada Technical Report (Sept 10-04)
Date: 2004-09-13
Stage: Technical Reports
Description: Indian and Northern Affairs Canada's Technical Report on the Dehcho Bridge Corporation's proposed Mackenzie River Bridge.
- Pre Hearing Conference Material (EA03-008)
Date: 2004-09-13
Stage: Pre-Hearing Conference
Description: Pre Hearing Conference guidelines and worksheets for the preparation of parties prior to the public hearing (October 21, 2004).
- Environment Canada Technical Report (Sept 10-04)
Date: 2004-09-10
Stage: Technical Reports
Description: Environment Canada's Technical Report on the Dehcho Bridge Corporation's proposed Mackenzie River Bridge.
- Outstanding Information Requests Response on Cumulative Effects
Date: 2004-09-07
Stage: Information Requests
Description: Final Response to Information Request 2.1.21 issued to the Dehcho Bridge Corporation
- Email from DCBC to MVEIRB re: technical reports questions and clarification
Date: 2004-09-07
Stage: Technical Reports
- DCBC response to Information Request 2.1.21
Date: 2004-09-07
Stage: Information Requests
- MVEIRB note to file re: DCBC indication of late final IR response submission date.
Date: 2004-09-03
Stage: Information Requests
- GNWT IR responses and Dillon Consulting report.
Date: 2004-08-31
Stage: Information Requests
Description: Dillon Consulting Ltd. report title: Phase I and II Environmental Site Assessment for Providence Ferry Landings, Ft. Providence, NWT.
- Proposed Information Requests from the Dehcho Bridge Corporation, second round
Date: 2004-08-24
Stage: Information Requests
Description: Deh Cho Bridge Co. responses to 2nd round of IRs sections 2.1.1 to 2.1.20.
- MVEIRB notification of report and conference dates to distribution list.
Date: 2004-08-24
Stage: EA Start Up
- MVEIRB to A.Gamble re: response to IR round 2 questions.
Date: 2004-07-26
Stage: Information Requests
- Revised EC - IRs
Date: 2004-07-26
Stage: Information Requests
Description: Clarifications.
- Information Requests issued by the MVEIRB (Round 2)
Date: 2004-07-26
Stage: Information Requests
Description: Information Requests related to the Mackenzie River Bridge project at Fort Providence, NWT
- Email from A.Gamble to MVEIRB re: IR round 2 response questions
Date: 2004-07-26
Stage: Information Requests
- Environment Canada - IRs
Date: 2004-07-16
Stage: Information Requests
- INAC - IRs
Date: 2004-07-16
Stage: Information Requests
Dehcho Bridge - Response to Information Requests 1.1.4
Date: 2004-07-06 Stage: Information Requests
Description: Dehcho Bridge Corporation's response to first round of information requests
- Dehcho Bridge Corporation's revised response to information requests
Date: 2004-07-10
Stage: Information Requests
Description: Revised responses to information request 1.1.4, Mackenzie River Bridge at Fort Providence, NWT
- Dehcho Bridge Corporation's response to information requests
Date: 2004-07-07
Stage: Information Requests
Description: Dehcho Bridge Corporations responses to the first round of information requests issued by the MVEIRB regarding the Mackenzie River Bridge at Fort Providence, NWT
- Information Requests issued by the MVEIRB (Round 1)
Date: 2004-06-30
Stage: Information Requests
Description: Information Requests related to the Mackenzie River Bridge project at Fort Providence, NWT
- Letter from the MVEIRB re: Party Status for the Dehcho Mackenzie River Bridge
Date: 2004-06-22
Stage: EA Start Up
Description: Letter states participants who have been granted party status to the environmental assessment of the Mackenzie River Bridge project at Fort Providence, NWT
- Identification Form for EA role - EC advice
Date: 2004-06-11
Stage: EA Start Up
- Identification Form for EA role - INAC
Date: 2004-06-11
Stage: EA Start Up
- Identification Form for EA role - NWT Metis Nation
Date: 2004-06-11
Stage: EA Start Up
- Identification Form for EA role - GNWT
Date: 2004-06-09
Stage: EA Start Up
- Notes on Site Visit at the Mackenzie River, Fort Providence, NWT
Date: 2004-06-08
Stage: Additional Information
Description: Notes on the MVEIRB's visit to Fort Providence to review the site of the proposed Mackenzie River Bridge.
- Identification Form for EA role - expert advice provided by DFO
Date: 2004-06-08
Stage: EA Start Up
- MVEIRB request for site visit to Deh Cho Bridge Co.
Date: 2004-06-02
Stage: Additional Information
- Letter from the MVEIRB to the Dehcho Bridge Corporation re: conformity with the Terms of Reference
Date: 2004-05-28
Stage: Developers Assessment Report
Description: Letter confirms that the revised Developer's Assessment Report conforms with the terms of reference for the environmental assessment of the Mackenzie River Bridge project at Fort Providence, NWT
- DAR Addendum 1
Date: 2004-05-28
Stage: Developers Assessment Report
- CBC news article on MLA questions on financial risks of bridge.
Date: 2004-05-27
Stage: Additional Information
- Letter from Jivko Engineering re: River navigation and the proposed Mackenzie River Bridge
Date: 2004-05-26
Stage: Additional Information
Description: Letter asks for comments on the proposed project at Fort Providence and it's conformity to the Navigable Waters Protection Act requirements.
- Appendix 1 - Updated Project Description rev may 25-04
Date: 2004-05-25
Stage: Developers Assessment Report
Description: Developer's Assessment Report for the Mackenzie River Bridge project at Fort Providence NWT
- Revised Developer's Assessment Report from the Dehcho Bridge Corporation
Date: 2004-05-24
Stage: Developers Assessment Report
Description: Revised version of the Developer's Assessment Report for the Mackenzie River Bridge project at Fort Providence, NWT
- Conformity Table for the Developer's Assessment Report
Date: 2004-04-21
Stage: Developers Assessment Report
Description: Table outlines which section conform or do not conform to the terms of reference set out for the environmental assessment of the Mackenzie River Bridge project at Fort Providence, NWT
- Letter from MVEIRB to the Dehcho Bridge Corporation re: Conformity of the developer's assessment report
Date: 2004-04-21
Stage: Developers Assessment Report
Description: Letter informs Dehcho Bridge Corporation that the submitted developer's assessment report does not conform to the terms of reference of the environmental assessment of the Mackenzie River Bridge Project at Fort Providence, NWT
- Letter from Jivko Engineering to Canadian Coast Guard re: Consultations related to the project
Date: 2004-04-20
Stage: Additional Information
Description: Letter on information related to additional consultations for the Mackenzie River Bridge project at Fort Providence, NWT
- Appendix 1 - Updated Project Description
Date: 2004-04-01
Stage: Developers Assessment Report
Description: Developer's Assessment Report for the Mackenzie River Bridge project at Fort Providence NWT
- Jivko Engineering letter to parties for comments and concerns on proposed bridge structure.
Date: 2004-03-26
Stage: Scoping
- Dehcho Bridge Corporation's Brief Project Description
Date: 2004-03-22
Stage: Developers Assessment Report
Description: Summarized version of the developer's assessment report for the Mackenzie River Bridge project at Fort Providence, NWT
- MVEIRB guideline to developer to submit a DAR
Date: 2004-03-17
Stage: Terms of Reference
- Final Terms of Reference
Date: 2004-03-05
Stage: Terms of Reference
- Comments on the Draft Terms of Reference by GNWT
Date: 2004-02-26
Stage: Terms of Reference
Description: Comments to the MVEIRB on the Draft Terms of Reference by GNWT - Resources, Wildlife and Economic Development on the Mackenzie River Bridge project at Fort Providence, NWT
- Comments on the Draft Terms of Reference by Environment Canada
Date: 2004-02-25
Stage: Terms of Reference
Description: Comments to the MVEIRB on the Draft Terms of Reference by Environment Canada on the Mackenzie River Bridge project at Fort Providence, NWT
- Comments on the Draft Terms of Reference by Indian and Northern Affairs
Date: 2004-02-25
Stage: Terms of Reference
Description:
Comments to the MVEIRB on the Draft Terms of Reference by Indian and Northern Affairs on the Mackenzie River Bridge project at Fort Providence, NWT
- Letter from Jivko Engineering to MVEIRB of provision of additional information related to application for water licence.
Date: 2004-02-20
Stage: Preliminary Screening
Description: Info was sent in both hardcopy and digital CD formats, files are too large to upload and are located at the MVEIRB public registry office.
- DFO letter to MVEIRB of notification of withdrawal of concern from NWT Chamber of Mines and discharging of responsibilities as preliminary screener.
Date: 2004-02-16
Stage: Preliminary Screening
- Application for Water Licence and additional information requested by DIAND
Date: 2004-02-12
Stage: Preliminary Screening
- MVEIRB letter to DIAND re: clarification of questions raised in January 11, 2005 meeting.
Date: 2004-02-11
Stage: Additional Information
Description: Letter response to several questions raised by DIAND inquiring about mitigation commmitments by the developer.
- Comments on the Draft Terms of Reference by Jivko Engineering
Date: 2004-02-09
Stage: Terms of Reference
Description: Comments to the MVEIRB on the Draft Terms of Reference by Jivko Engineering on the Mackenzie River Bridge project at Fort Providence, NWT
- Comments on the Draft Terms of Reference by developer
Date: 2004-02-09
Stage: Terms of Reference
Description: Comments to the MVEIRB on the Draft Terms of Reference by the Dehcho Bridge Corporation on the Mackenzie River Bridge project at Fort Providence, NWT
- Letter from the NWT Chamber of Mines to Fisheries and Oceans Canada and MVEIRB re: letter of concern
Date: 2004-02-04
Stage: EA Start Up
Description: Chamber of Mines withdraws it's letter of concern regarding the environmental assessment of the Mackenzie River Bridge project
- Letter from Jivko Engineering to MVEIRB re: Additional information for project water license application
Date: 2004-02-04
Stage: Developers Assessment Report
Description: Cover letter for additional information provided for Mackenzie River Bridge project at Fort Providence, NWT
- Draft Terms of Reference an Workplan
Date: 2004-02-04
Stage: Terms of Reference
- Dillon Consulting Final Report (Feb 2004)
Date: 2004-02-01
Stage: Technical Reports
Description: GNWT Phase I and II Environmental Site Assessment of the Fort Providence Ferry Landings - Final Report (February 2004)
- Dillon Consulting Final Report (Feb 2004) - Appendix A
Date: 2004-02-01
Stage: Technical Reports
Description: Appendix A - FINAL REPORT (February 2004)
- Dillon Consulting Final Report (Feb 2004) - Appendix B
Date: 2004-02-01
Stage: Technical Reports
Description: Appendix B - Final REPORT (February 2004)
- Dillon Consulting Final Report (Feb 2004) - Appendix C
Date: 2004-02-01
Stage: Technical Reports
Description: Appendix C - FINAL Report GNWT (February 2004)
- Dillon Consulting Final Report (Feb 2004) - Appendix E
Date: 2004-02-01
Stage: Technical Reports
Description: Appendix E FINAL Report GNWT (February 2004)
- Dillon Consulting Final Report (Feb 2004) - Appendix F
Date: 2004-02-01
Stage: Technical Reports
Description: Appendix F FINAL Report GNWT (February 2004)
- Dillon Consulting Final Report (Feb 2004) - Appendix G
Date: 2004-02-01
Stage: Technical Reports
Description: Appendix G - FINAL Report GNWT (February 2004)
- Appendix D - Dillon Report
Date: 2004-02-01
Stage: Technical Reports
Description: Appendix D of the Dillon Consulting GNWT commissioned FINAL REPORT.
- Dillon Consulting Final Report (Feb 2004) - Appendix D
Date: 2004-02-01
Stage: Technical Reports
Description: Appendix D - Final REPORT GNWT (February 2004)
- Letter from the Dehcho Bridge Corporation to the MVEIRB, the Mackenzie Valley Land & Water Board and Fisheries and Oceans Canada re: EA of the Mackenzie River Bridge
Date: 2004-01-27
Stage: EA Start Up
Description: Letter concerning the status of the environmental assessment of the Mackenzie River Bridge at Fort Providence, NWT
- Letter from the Dehcho Bridge Corporation to the NWT Chamber of Mines re: Mackenzie River Bridge project
Date: 2004-01-26
Stage: EA Start Up
Description: Letters from Andrew Gamble to the Chamber of Mines
- Chamber of Mines-Withdraw letter of concern
Date: 2004-01-26
Stage: EA Start Up
Description: The NWT Chamber of Mines letter of Jan. 26/04 withdrawing its letter of concern. Duplicated file.
- Letter from the Dehcho Bridge Corporation to Fisheries and Oceans Canada re: EA of the Mackenzie River Bridge
Date: 2004-01-14
Stage: EA Start Up
Description: Letter requests clarification on the status of the environmental assessment of the Mackenzie River Bridge project at Fort Providence, NWT
- Edmonton Sun news article
Date: 2004-01-14
Stage: Additional Information
- News media advertisement for referral to EA
Date: 2004-01-10
Stage: EA Start Up
- Northern News Services news article
Date: 2004-01-09
Stage: Additional Information
Description: Re: Delayed bridge construction
- Preliminary Screening report and referral from the Department of Fisheries and Oceans
Date: 2004-01-06
Stage: Preliminary Screening
Description: Preliminary Screening report and referral from the Department of Fisheries and Oceans
- Notice of Referral for the Dehcho Bridge Corporation
Date: 2004-01-02
Stage: EA Start Up
Description: Announces the referral of the Dehcho Bridge Corporation's proposed Mackenzie River Bridge project to environmental assessment
- Project Description and Preliminary Design Drawings-updated Jan 2004
Date: 2004-01-01
Stage: Developers Assessment Report
Description: Developer's Assessment Report for the Mackenzie River Bridge project at Fort Providence NWT
- Deh Cho Bridge Permitting Process
Date: 2004-01-01
Stage: Preliminary Screening
Description: Records of applications, reports and correspondence. File is too large to upload, hard copy of 2 volume binders is located at the MVEIRB public registry office.
- Draft Workplan for the Mackenzie River Bridge project
Date: 2003-12-18
Stage: EA Start Up
Description: Draft Workplan EA for the proposed Mackenzie River Bridge project at Fort Providence, NWT
- Globe and Mail News article
Date: 2003-09-13
Stage: Additional Information
- INAC news release
Date: 2003-04-14
Stage: Additional Information
Description: Re: Additional funding support to Ft. Providence for Deh Cho Bridge Proposal
- Deh Cho Bridge Act
Date: 2003-02-20
Stage: Additional Information
Description: Authorization from Minister and on behalf of the GNWT to enter into agreements with a concessionarire to construct, operate and maintain the Deh Cho Bridge.
- Letter from the Northern Transport Company Ltd to the Dehcho Bridge Corporation re: support for the Mackenzie River Bridge
Date: 2003-01-09
Stage: Additional Information
Description: Letter confirms support for the Mackenzie River Bridge project at Fort Providence, NWT, with certain conditions
- Northern Transportation Co. letter to Deh Cho Bridge Co. confirmation of agreement for structure modifications.
Date: 2003-01-09
Stage: Scoping
- CBC News article on rising steel prices and bridge costs.
Date: 2002-05-10
Stage: Additional Information
- Dehcho Bridge Corporation Presentation
Date: 0000-00-00
Stage: Public Hearings
Description: Developer's presentation at public hearing regarding Mackenzie River Bridge project at Fort Providence, NWT
- Appendix 10 - Dehcho Bridge Act
Date: 0000-00-00
Stage: Developers Assessment Report
Description: Developer's Assessment Report for the Mackenzie River Bridge project at Fort Providence NWT
- Appendix 12 - Nichols Benefit-Cost Analysis
Date: 0000-00-00
Stage: Developers Assessment Report
Description: Developer's Assessment Report for the Mackenzie River Bridge project at Fort Providence NWT
- Appendix 13 - Traffic Forecast
Date: 0000-00-00
Stage: Developers Assessment Report
Description: Developer's Assessment Report for the Mackenzie River Bridge project at Fort Providence NWT
- Appendix 14 - Golder Report
Date: 0000-00-00
Stage: Developers Assessment Report
Description: Developer's Assessment Report for the Mackenzie River Bridge project at Fort Providence NWT
- Appendix 15 - Trillium Hydrotechnical Report
Date: 0000-00-00
Stage: Developers Assessment Report
Description: Developer's Assessment Report for the Mackenzie River Bridge project at Fort Providence NWT
- Appendix 16 - EBA Geotechnical report
Date: 0000-00-00
Stage: Developers Assessment Report
Description: Developer's Assessment Report for the Mackenzie River Bridge project at Fort Providence NWT
- Appendix 1A - Plans & Drawings
Date: 0000-00-00
Stage: Developers Assessment Report
Description: Developer's Assessment Report for the Mackenzie River Bridge project at Fort Providence NWT
- Appendix 1B - Schematic Spill Contingency Plan
Date: 0000-00-00
Stage: Developers Assessment Report
Description: Developer's Assessment Report for the Mackenzie River Bridge project at Fort Providence NWT
- Appendix 3 - MACKENZIE VALLEY LAND AND WATER BOARD Water License Application
Date: 0000-00-00
Stage: Developers Assessment Report
Description: Developer's Assessment Report for the Mackenzie River Bridge project at Fort Providence NWT
- Appendix 4 - Coast Guard NWPA Application
Date: 0000-00-00
Stage: Developers Assessment Report
Description: Developer's Assessment Report for the Mackenzie River Bridge project at Fort Providence NWT
- Appendix 5 - Fisheries and Oceans Application
Date: 0000-00-00
Stage: Developers Assessment Report
Description: Developer's Assessment Report for the Mackenzie River Bridge project at Fort Providence NWT
- Appendix 6 - MACKENZIE VALLEY LAND AND WATER BOARD Land Use Application
Date: 0000-00-00
Stage: Developers Assessment Report
Description: Developer's Assessment Report for the Mackenzie River Bridge project at Fort Providence NWT
- Appendix 7 - Draft Community Benefits Commitment Plan
Date: 0000-00-00
Stage: Developers Assessment Report
Description: Developer's Assessment Report for the Mackenzie River Bridge project at Fort Providence NWT
- Appendix 8 - Nadli Report on Benefits Plan
Date: 0000-00-00
Stage: Developers Assessment Report
Description: Developer's Assessment Report for the Mackenzie River Bridge project at Fort Providence NWT
- Appendix 9 - Letters of Support
Date: 0000-00-00
Stage: Developers Assessment Report
Description: Developer's Assessment Report for the Mackenzie River Bridge project at Fort Providence NWT
- Appendix 11 Memorandum of Intent
Date: 0000-00-00
Stage: Developers Assessment Report
Description: Developer's Assessment Report for the Mackenzie River Bridge project at Fort Providence NWT
- Appendix 2 - Correspondence
Date: 0000-00-00
Stage: Developers Assessment Report
Description: Developer's Assessment Report for the Mackenzie River Bridge project at Fort Providence NWT
- 3 Geotechnical Investigation Report-EBA Engineering Feb 2004
Date: 0000-00-00
Stage: Developers Assessment Report
Description: Developer's Assessment Report for the Mackenzie River Bridge project at Fort Providence NWT
- 2 Fish Habitat Assessment Report-Golder Associates Jan29-04
Date: 0000-00-00
Stage: Developers Assessment Report
Description: Developer's Assessment Report for the Mackenzie River Bridge project at Fort Providence NWT
- 4 Updated Hydrotechnical Info Rep-Trillium Eng Nov 2003 Part 1
Date: 0000-00-00
Stage: Developers Assessment Report
Description: Developer's Assessment Report for the Mackenzie River Bridge project at Fort Providence NWT
- 4 Updated Hydrotechnical Info Rep-Trillium Eng Nov 2003 Part 2
Date: 0000-00-00
Stage: Developers Assessment Report
Description: Developer's Assessment Report for the Mackenzie River Bridge project at Fort Providence NWT
- 4 Updated Hydrotechnical Info Rep-Trillium Eng Nov 2003 Part 3
Date: 0000-00-00
Stage: Developers Assessment Report
Description: Developer's Assessment Report for the Mackenzie River Bridge project at Fort Providence NWT
- Revised Appendix D for the Dehcho Bridge DAR
Date: 0000-00-00
Stage: Developers Assessment Report
Description: Revised Appendix D for the Dehcho Bridge Developer's Assessment Report.
- Dehcho Bridge - Developers Assessment Report
Date: 0000-00-00
Stage: Developers Assessment Report
- public hearing notice advertisement in the Deh Cho Drum paper
Date: 0000-00-00
Stage: Public Hearings
- Board decisions for reports and conference due dates for various EA phases.
Date: 0000-00-00
Stage: Additional Information
|
|
|
|
|
|
|